Meter Testing Workflow

The workflow for the meter tester can be defined by the utility. It allows to create systematic meter test sequences. Once the structure is defined, all meter testers will report with the same testing content and nothing will be forgotten. The RS350 guides the user trough all test steps.
The test sequence can include:

  • recording site data
  • verification of proper sealing
  • taking of photos
  • accuracy tests
  • record of the GPS location
  • Signature of witness
  • Report generation
RS350 workflow
RS350 workflow
Meter Testing Workflow